On Saturday after a long Friday night of partying we woke up around 9 and tore down our side wall. We had to take this down so we could get access to the backyard. It didn't take long to get this down. At first we thought it was going to be a cinder block wall that was stuccoed but it ended up being a wood wall that was stuccoed so it came down in one piece.
After we took that down we went and grabbed some food. They dropped off the first load of dirt around 12:30 which Geoff ended up moving by himself. Slowly all of our friends started showing up. Within a few hours we had it almost done. Here is where we left Saturday, so much progress!
We also had a bunch of dirt left in our driveway to finish moving. We took 4 days to move the rest of the dirt.
I can say we are officially done filling in the pool! Thanks to our friends and our brothers we got it all done! Woohoo! now that is progress!

Now we need to remove all the cinder block and concrete. We also need to figure out what we are going to do with all of this space!