Monday, February 18, 2013

Four Day Weekend!

 I am very happy with the progress that we made on the house this weekend. Some of the projects have taken a lot longer to finish than others. The backyard has definitely been a long running project and I am sure it will be for a while. Over our four day weekend we ordered a dumpster and hauled off all the concrete from the backyard. Almost all of the concrete was from last April when we removed the swimming pool. It was a lot of work and thanks to all the help from our family and friends we got it done. The final total tonnage for the dumpster ended up being 9 tons. I can hardly believe that we moved that much concrete into that dumpster but we did.
While Geoff and our friends moved all that concrete, I stayed inside and helped my dad install our newly finished wall cabinets.  I cannot get over how great it is to have storage space again. Here is a picture of the two cabinets that we are using for all of drinking glasses. The plan is to put glass inserts in the cabinet doors and have glass shelves.

Also on the list of projects was a workbench in the garage. We are really bad about randomly throwing tools in places and forgetting where we put them. Having a place for all of our tools is definitely going to be a nice addition. I painted the wall the night before and in the morning we built a frame out of 2x4's and mounted those to the wall studs. For the top we screwed down a piece of OSB. We also mounted a shelving system. We haven't finished it yet and we still need to organize all the tools but its a great start.

The last two things we did this weekend were finally installing the baseboards in the guest bathroom and also adding two shelves to the cubby. We still need to add the actual top to the shelf and paint them white but we can do that another day.

How was your Presidents day weekend? Get any major projects done?