Tuesday, January 28, 2014

Slowing down

We have been working hard trying to get the kitchen finished before moving on to any other projects. We have finished: tile, appliances, cabinets, counter tops, sink and faucet. Now I am working to get the breakfast bar with shelves built.

The shelf has started off with a few issues. I am having a hard time getting my brain back into building mode again. I have felt very defeated the last couple of days because of this shelf, it has been very frustrating. I forced myself to walk away from the project for a few days because I feel like I am trying to rush the project just to get it done. I need to slow down and look it over more.  Luckily, I am forced to stop for a bit until some items I ordered come in. It is probably a good thing, I am now forced to reconsider some of my decisions. I rushed installing the base pipe supports and definitely paid for it. Garrett and I got them installed  fairly quick and I was so excited to have it finished. I placed a random board on it to make sure it was level and this happened...
We forgot about the outlet and did a perfect job of splitting it in two.  I have considered  lowering the shelf (Geoff says no), raising the shelf (I don't really want that) and finally notching out the shelf for access. We will most likely be doing the third option.

While we kill time waiting on the shelf pieces I have been working on other small but important items for the kitchen. I can now focus on the finishing touches that will make the kitchen unique and feel complete. Garrett and I removed the center of one of the old cabinet doors, that way we can have glass cabinet doors for two of the upper cabinets. I am pretty excited to get these done. 
As you can see here, I still need to sand it down a bit and stain the frame to match the cabinetry. Additionally, I need to route out the back for the glass to sit in. I really feel like this will add some character to the kitchen, well at least some visual interest. 

Thursday, January 2, 2014

Kitchen update...

Happy New Year!  2014 holy mole I can't believe how fast 2013 went. I swear I just started on this kitchen... O WAIT! that was 2012.. OOPS!

Well yes I am still working on the kitchen but I have made ridiculous progress on it since the last time I posted about the kitchen. (Sorry for the iPhone photos I will get better pictures up when I am done with this project. Hopefully that is soon.)

We completely rearranged the whole layout. Moved the fridge, moved the range over so that it was centered with the window and sink that are across from it, moved the pantry cabinet and added a new appliance. Thanks Joyce Ann for the trash compactor. 


Yes those counter tops are concrete and yes we made them :) They have been awesome so far!


This is where the refrigerator used to live. Now we have the pantry and a little wine cubby that we built.


We moved the drinking cabinets  to the left of the microwave and now you can see where we moved the refrigerator. (Excuse the messy counter tops I am in the process of painting the interior of one of the cabinets.)


I promise that sink is not really going to be blue! that is just the protective cover on it because we have yet to install it.

 There are 2 blank spaces on either side of the sink, the closest one is for the trash compactor and the other is for the dish washer.

I have a bunch more photos to so you but I thought a quick little update would be nice. :)

This weekend we are planning on doing our tile so once that is going I will try to post more pictures!